About us
電腦化設施規劃與模擬實驗室
地址:32003 桃園市中壢區遠東路135號 元智大學 二館5樓 R2504室
電話:03-4638800 轉 2516-2506
DR. JEN, HEN-YI [email protected]
DR. HUANG, HAO [email protected]
2023
Project Name | Project Period | Project Leader | Competent Authority |
Analysis of PCR testing energy and personnel workload in Taoyuan Hospital Laboratory Department | 2023/06/01~2023/12/31 | DR. JEN, HEN-YI | Taoyuan Hospital Laboratory Department |
Yuan Ze University Data Joint R&D Center Project (Third)—Simulation Analysis of Manpower Saturation in FPC/RPCB Plants | 2023/10/01~NOW | DR. JEN, HEN-YI | Zhen Ding Tech. |
2022
Project Name | Project Period | Project Leader | Competent Authority |
Use computer simulation to analyze the treatment process, treatment manpower load, hospital bed and medical equipment allocation in hospitals where patients are admitted during a large-scale epidemic outbreak | 2022/08/01~2023/08/31 | DR. JEN, HEN-YI | NSTC/td> |
Yuanzhi University Data Joint R&D Center Project (Second)--Simulating Intelligent Logistics Multi-Option Support Decision Analysis | 2022/01/01~2023/09/31 | DR. JEN, HEN-YI | Zhen Ding Tech. |
2020
Project Name | Project Period | Project Leader | Competent Authority |
Yuanzhi University cooperates with Zhending Group - Smart Manufacturing Big Data Analysis Project - Using FlexSim computer simulation to evaluate the synergy and optimization of PCB smart logistics production | 2020/09/01~2021/12/31 | DR. JEN, HEN-YI | Zhen Ding Tech. |
Establishment and analysis of warehousing simulation model | 2020/07/01~2020/10/31 | DR. JEN, HEN-YI | Taiwan Takisawa Ltd, Co. |
Multi-objective simulation optimization considers risk in two-stage stochastic capacity planning - applied to thin film transistor and liquid crystal display manufacturing (II) | 2020/08/01~2021/07/31 | DR. HUANG, HAO | NSTC |
2019
Project Name | Project Period | Project Leader | Competent Authority |
Multi-objective simulation optimization considers risks in two-stage stochastic capacity planning - applied to thin film transistor and liquid crystal display manufacturing (I) | 2019/08/01~2020/07/31 | DR. HUANG, HAO | NSTC |
2018
Project Name | Project Period | Project Leader | Competent Authority |
Simulation Optimization Algorithm - Multi-Objective and Multi-Precision Probabilistic Branch and Bound Method (2nd Year) | 2019/08/01~2019/07/31 | DR. HUANG, HAO | NSTC |
2016
Project Name | Project Period | Project Leader | Competent Authority |
Analysis of using computer simulation to evaluate rehabilitation physical therapy process and medical resource allocation. | 2016/08/01~2017/07/31 | DR.JEN,HEN-YI | NSTC |
CPS platform architecture technology research and development and application verification plan, responsible for sub-project 5: computer simulation and production management of intelligent production. This project also participated in the "2019 Taiwan Robotics" under the instruction of the Ministry of Science and Technology in August 2019. And the results display of the Smart Automation Exhibition - Smart Machinery Innovation Collaboration Hall of the Ministry of Science and Technology. | 2016/08/01~2019/08/31 | DR.JEN,HEN-YI | Benq Materials |
2014
Project Name | Project Period | Project Leader | Competent Authority |
Research on innovation of high-quality aging medical service system (I). | 2014/08/01~2015/07/31 | DR.JEN,HEN-YI | NSTC |
2013
Project Name | Project Period | Project Leader | Competent Authority |
A method combining differential evolution algorithm and optimal computing resource allocation to estimate simulation parameters of hospital ward service satisfaction. | 2013/08/01~2014/07/31 | DR.JEN,HEN-YI | NSTC |
2010
Project Name | Project Period | Project Leader | Competent Authority |
Android UI Template Development。 | 2010/10/01~2011/08/31 |
DR.JEN,HEN-YI Jen, Hen-Yi & Lin, Ray F. |
Far EasTone Telecommunications Co., Ltd |
2008
Project Name | Project Period | Project Leader | Competent Authority |
Simulation optimization analysis integrating lean supply and demand processes - taking the merger of healthy food supply and demand flows as an example (I). | 2008/08/01~2009/07/31 | DR.JEN,HEN-YI | NSTC |
2006
Project Name | Project Period | Project Leader | Competent Authority |
Compose my country's industrial case plan - e-construction industry and engineering project management case - Changhong Construction (Honglin Construction) Co., Ltd. | 2006/11/02~2007/04/01 | DR.JEN,HEN-YI | Ministry of Education |
2003
Project Name | Project Period | Project Leader | Competent Authority |
Applying genetic algorithms to facility layout problems in wafer manufacturing plants. | 2003/08/01~2004/07/31 | DR. HU, HUANG-TE | NSTC |
2002
Project Name | Project Period | Project Leader | Competent Authority |
Discussion on facility layout issues based on department adjacency evaluation. | 2002/08/01~2003/07/31 | DR. HU, HUANG-TE | NSTC |
Facility planning and analysis of large-scale mass merchandise stores - taking Taoyuan area as an example. | 2002/08/01~2003/02/28 | DR. HU, HUANG-TE | NSTC |
1997
Project Name | Project Period | Project Leader | Competent Authority |
Applying genetic algorithms to facility layout problems in wafer manufacturing plants. | DR. HU, HUANG-TE | NSTC |
1993
Project Name | Project Period | Project Leader | Competent Authority |
Ethics teaching in industrial engineering. | DR. HU, HUANG-TE | NSTC | |
Research on rationality assessment model of advanced manufacturing system (AMS) (I). | DR. HU, HUANG-TE | NSTC |
1992
Project Name | Project Period | Project Leader | Competent Authority |
Research on non-manufacturing system facility planning model (II). | DR. HU, HUANG-TE | NSTC | |
Research on rationality assessment model of advanced manufacturing system (AMS) (I). | DR. HU, HUANG-TE | NSTC |
1991
Project Name | Project Period | Project Leader | Competent Authority |
An integrated model for facility planning and material handling assessment technology. | DR. HU, HUANG-TE | NSTC |
1990
Project Name | Project Period | Project Leader | Competent Authority |
Flexible facility planning model. | DR. HU, HUANG-TE | NSTC |
|
|
|
|
|